| Guidance to Readers | 328KB |
View |
| 4.3.1-1 | Technical Baseline Report - Physical Processes | 26.1MB | View |
| 4.3.1-2 | Physical Process Modelling for Dublin Array Offshore Wind Farm | 15.1MB | View |
| 4.3.1-2a | Geophysical and Geotechnical Desk Study for Dublin Array Wind Farm | 15.1MB | View |
| 4.3.1-3 | Hydrodynamic Calibration and Validation Report | 7.6MB | View |
| 4.3.1-4 | Spectral Wave Model Calibration and Validation Report | 7.5MB | View |
| 4.3.1-5 | Physical Processes Modelling and Design Options Comparison Report | 796KB | View |
| 4.3.2-1 | Water Framework Directive and Marine Strategy Framework Directive Summary | 5.9MB | View |
| 4.3.3-1 | Technical Baseline Report – Benthic Subtidal and Intertidal Ecology | 14.6MB | View |
| 4.3.3-2 | Marine Intertidal Ecological Survey, Shanganagh and Poolbeg, Co. Dublin | 8.6MB | View |
| 4.3.3-3 | Fugro - WPM1, WPM2 & WPM3 - Main Array & ECR - Benthic Ecology Monitoring Report | 12.7KB | View |
| 4.3.3-4 | Fugro – WPM1, WPM2 & WPM3 – Array Area & ECR – Environmental Features Report (Habitat Analysis Only) | 3.2MB | View |
| 4.3.3-5 | Underwater Image Analysis | 2.8MB | View |
| 4.3.4-1 | Technical Baseline Report - Fish and Shellfish Ecology | 42.3MB | View |
| 4.3.4-2 | A Fisheries survey of the Kish and Bray banks | 873KB | View |
| 4.3.5-1 | Technical Baseline Report – Marine Mammals | 11.5MB | View |
| 4.3.5-2 | Dublin Array OWF Marine Mammal Abundance Estimates 2019-2021 | 1014KB | View |
| 4.3.5-3 | Estimating harbour porpoise abundance using spatial and temporal modelling - update | 1.1MB | View |
| 4.3.5-4 | Boat Based Bird and Marine Mammal Survey Report June 2019 - September 2020 | 5.9MB | View |
| 4.3.5-5 | Boat Based Bird and Marine Mammal Survey Report October 2020 April 2021 | 4.8MB | View |
| 4.3.5-6 | Phase 1 Irish Offshore Wind Farms: Cumulative iPCoD modelling | 2.6MB | View |
| 4.3.5-7 | Dublin Array: Underwater noise assessment | 1.1MB | View |
| 4.3.5-8 | Derogation Licence Application | 4.1MB | View |
| 4.3.6-1 | Technical Baseline Report – Ornithology | 7.2MB | View |
| 4.3.6-2 | Method Statement: Offshore Wind Ornithology Assessment for East Coast Phase 1 Projects | 1.5MB | View |
| 4.3.6-3 | Review of Method Statement, Offshore Wind Ornithology Assessment for East Coast Phase 1 Projects | 1.3MB | View |
| 4.3.6-4 | Seabird Collision Risk Modelling | 656KB | View |
| 4.3.6-5 | Offshore Ornithology Migratory Collision Risk Modelling | 767KB | View |
| 4.3.6-6 | Displacement Matrices | 1.9MB | View |
| 4.3.6-7 | Offshore Ornithology Population Viability Analyses | 6.1MB | View |
| 4.3.6-8 | Intertidal Bird Surveys at Two Potential Grid Connection Cable Landfall Locations - Winter 2019/20 and Autumn 2020 | 8.5MB | View |
| 4.3.6-9 | Intertidal Bird Surveys at Shanganagh WWTP – Winter 2023/24 | 18.8MB | View |
| 4.3.7-1 | Offshore Bats Technical Baseline Report | 2.2MB | View |
| 4.3.9-1 | Technical Report – Commercial Fisheries | 67.4MB | View |
| 4.3.10-1 | Dublin Array Offshore Wind Farm Navigation Risk Assessment | 10.8MB | View |
| 4.3.10-2 | Dublin Array Offshore Wind Farm Winter Survey 2019 | 5MB | View |
| 4.3.10-3 | Dublin Array Offshore Wind Farm Marine Traffic Survey Report Summer 2021 | 5.2MB | View |
| 4.3.10-4 | Dublin Array Offshore Wind Farm Marine Traffic Survey Report Winter 2022 | 5.3MB | View |
| 4.3.10-5 | Dublin Array Offshore Wind Farm Vessel Traffic Survey Report Summer 2023 | 5MB | View |
| 4.3.10-6 | Dublin Array Offshore Wind Farm Long-Term Data Annex | 3MB | View |
| 4.3.12-1 | Instrument Flight Procedures Assessment | 8.5MB | View |
| 4.3.12-2 | The Potential Impact of the Dublin Array on Helicopter Operations to the Kish Tower – Helicopter One Engine Inoperative Case | 656KB | View |
| 4.3.12-3 | Radar Assessment Report | 12.5MB | View |
| 4.3.13-1 | Technical Baseline Report – Marine Archaeology | 9.4MB | View |
| 4.3.13-2 | Stage 1 Geoarchaeological Report | 2.1MB | View |
| 4.3.13-3 | Geophysical Survey 2021: Archaeological Report to support Detection Device Licence 21R0027 | 8.7MB | View |
| 4.3.13-4 | Archaeology Intertidal Survey, Shanganagh | 18.5MB | View |
| 4.3.14-1 | Cultural Heritage Settings Assessment Technical Baseline Report | 863KB | View |
| 4.3.15-1 | SLVIA Methodology | 1.3MB | View |
| 4.3.15-2 | Visual Assessment of Turbine Lighting | 596KB | View |
| 4.3.15-3 | SLVIA GIS Figures | 226.7MB | View |
| 4.3.15-4 | SLVIA Visualisations | 107.4MB | View |
| 4.3.16-1 | Construction, Operational & Cumulative Noise Predictions | 856KB | View |
| 4.3.18-1 | Greenhouse Gas Assessment | 1MB | View |
| 4.3.20-1 | Offshore Technical Baseline Report - Operations and Maintenance Base | 5.1MB | View |